We aspire to implement an investment plan to ensure that the generation assets are aligned with current and future environmental requirements
Key investments made:
- Heat bank in the Siekierki CHP Plant
- Biomass-fired boiler in the Siekierki CHP Plant
- Combined cycle gas turbine unit in the Żerań Combined Heat and Power Plant
- Two gas-fired peak boiler rooms KG1 and KG2 in the Żerań Combined Heat and Power Plant
- Photovoltaic system at the Kawęczyn Heat Plant
- Connection gas pipeline to the Kawęczyn Heat Plant
Planned investments:
- Construction of a gas pipeline to the Siekierki CHP Plant
- Combined cycle gas turbine unit in the Siekierki Combined Heat and Power Plant
- Gas boiler room in the Siekierki Combined Heat and Power Plant
- Biomass boiler room in the Pruszków Combined Heat and Power Plant
- Heat bank in the Żerań CHP Plant
- Photovoltaic system with a capacity of 1MWe at the premises of the Wola Heat Plant